{"id":4828,"date":"2022-04-21T16:14:44","date_gmt":"2022-04-21T14:14:44","guid":{"rendered":"https:\/\/eeagrants.hr\/?p=4828"},"modified":"2022-04-21T16:14:44","modified_gmt":"2022-04-21T14:14:44","slug":"the-funding-decision-within-the-call-increased-geothermal-energy-production-capacity-adopted","status":"publish","type":"post","link":"https:\/\/eeagrants.hr\/en\/the-funding-decision-within-the-call-increased-geothermal-energy-production-capacity-adopted\/","title":{"rendered":"The Funding Decision within the Call \u201cIncreased geothermal energy production capacity\u201d adopted"},"content":{"rendered":"<p>The Ministry of Regional Development and EU Funds, in the role of the Programme Operator, upon the completion of projects` assessment and selection within the Open Call for Project Proposals \u201cIncreased geothermal energy production capacity\u201d, a total value of 4.956.000,00 EUR, on 20th April 2022 adopted the Funding Decision. Following the Funding Decision, the Project Contracts will be concluded with the selected Applicants.<\/p>\n<p>The Funding Decision may be found at the following <strong><a href=\"https:\/\/eeagrants.hr\/wp-content\/uploads\/2022\/04\/OOF_Povecanja-kapaciteta-za-proizvodnju-geotermalne-energije.pdf\">link<\/a>.<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Regional Development and EU Funds, in the role of the Programme Operator, upon the completion of projects` assessment and selection within the Open Call for Project Proposals \u201cIncreased geothermal energy production capacity\u201d, a total value of 4.956.000,00 EUR, on 20th April 2022&#8230;<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65,93],"tags":[],"cmcal_calendar":[],"class_list":["post-4828","post","type-post","status-publish","format-standard","hentry","category-news","category-news-energy-and-climate-change"],"_links":{"self":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts\/4828"}],"collection":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/comments?post=4828"}],"version-history":[{"count":1,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts\/4828\/revisions"}],"predecessor-version":[{"id":4829,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts\/4828\/revisions\/4829"}],"wp:attachment":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/media?parent=4828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/categories?post=4828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/tags?post=4828"},{"taxonomy":"cmcal_calendar","embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/cmcal_calendar?post=4828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}