{"id":4854,"date":"2022-05-09T17:44:13","date_gmt":"2022-05-09T15:44:13","guid":{"rendered":"https:\/\/eeagrants.hr\/?p=4854"},"modified":"2022-05-13T13:49:27","modified_gmt":"2022-05-13T11:49:27","slug":"the-funding-decision-within-the-call-increased-geothermal-energy-production-capacity-adopted-2","status":"publish","type":"post","link":"https:\/\/eeagrants.hr\/en\/the-funding-decision-within-the-call-increased-geothermal-energy-production-capacity-adopted-2\/","title":{"rendered":"The Funding Decision within the Call \u201cIncreased solar energy production capacity\u201d adopted"},"content":{"rendered":"<p>The Ministry of Regional Development and EU Funds, in the role of the Programme Operator, upon the completion of projects` assessment and selection within the Open Call for Project Proposals \u201cIncreased solar energy production capacity\u201d, a total value of 7.400.000,00 EUR, on 6<sup>th<\/sup> May 2022 adopted the Funding Decision. Following the Funding Decision, the Project Contracts will be concluded with the selected Applicants.<\/p>\n<p>The Funding Decision may be found at the following <strong><a href=\"https:\/\/eeagrants.hr\/wp-content\/uploads\/2022\/05\/Odluka-o-financiranju_Povecanje-kapaciteta-za-proizvodnju-solarne-energije_II.pdf\">link<\/a>.<\/strong><\/p>\n<p>Based on the approval of the Cooperation Committee on the reallocation of leftover funds in the scope of the Calls for Proposals of the &#8220;Energy and Climate Change Programme&#8221;,\u00a0 as of 13<sup>th<\/sup>\u00a0 May 2022 the Ministry of Regional Development and EU Funds adopted the Decision on the amendments of the Funding Decision, downloadable from the following <strong><a href=\"https:\/\/eeagrants.hr\/wp-content\/uploads\/2022\/05\/Odluka-o-izmjeni-i-dopuni-Odluke-o-finaciranju_Povecanje-kapaciteta-za-proizvodnju-solarne-energije.pdf\">link<\/a><\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Regional Development and EU Funds, in the role of the Programme Operator, upon the completion of projects` assessment and selection within the Open Call for Project Proposals \u201cIncreased solar energy production capacity\u201d, a total value of 7.400.000,00 EUR, on 6th May 2022&#8230;<\/p>\n","protected":false},"author":20,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[65,93],"tags":[],"cmcal_calendar":[],"class_list":["post-4854","post","type-post","status-publish","format-standard","hentry","category-news","category-news-energy-and-climate-change"],"_links":{"self":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts\/4854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/comments?post=4854"}],"version-history":[{"count":5,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts\/4854\/revisions"}],"predecessor-version":[{"id":4879,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/posts\/4854\/revisions\/4879"}],"wp:attachment":[{"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/media?parent=4854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/categories?post=4854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/tags?post=4854"},{"taxonomy":"cmcal_calendar","embeddable":true,"href":"https:\/\/eeagrants.hr\/en\/wp-json\/wp\/v2\/cmcal_calendar?post=4854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}